检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:涂亚军 焦平文 吕世磊 周卫波 安重霖 TU Yajun;JIAO Pingwen;LYU Shilei;ZHOU Weibo;AN Zhonglin(East China Power Transmission and Transformation Engineering Co.,Ltd.,Shanghai 201803,China;State Grid Shandong Eleetrie Power Construetion Company,Jinan 250001,China)
机构地区:[1]华东送变电工程有限公司,上海201803 [2]国网山东省电力公司建设公司,山东济南250001
出 处:《山东电力技术》2018年第9期47-49,共3页Shandong Electric Power
摘 要:特高压换流站设备分期投运时容易发生安全事故,因此,必须做好隔离保护,分析交流场进行带电隔离的具体措施,在对二次设备分期投运进行安全隔离时,主要分析交流控制系统和直流阀组控制系统联锁回路情况,交流进线开关出现跳闸问题,TA回路的保护措施,无功控制回路的处理情况。The risk of security incidents is high during start-up of the parallel ultra-high-vohage converter station equipment. So the isolation protection must be carefully performed.The following analysis of the exchange field for specific measures of live isolation in the secondary equipment put into operation for safe isolation,This paper mainly emphasize on the analysis of AC control system and DC valve control system interlock circuit,AC line switch trip problems,TA circuit protection measures, reactive power control circuit processing.
分 类 号:TM721.1[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7