大型水电工程建设期稳定的风险防控工作思考与实践  被引量:2

Thinking and Practice on Stability Risk Prevention and Control during the Construction of Large Hydropower Project

在线阅读下载全文

作  者:罗立云 LUO Liyun(Guodian Dadu River Hydropower Development Co., Ltd., Chengdu 610041, Sichuan, China)

机构地区:[1]国电大渡河流域水电开发有限公司,四川成都610041

出  处:《水力发电》2018年第11期52-55,共4页Water Power

摘  要:大型水电工程建设期稳定风险日益受到关注和重视。维护工程建设期间的社会稳定是合规有序推进水电工程建设的根本保证,也是水电开发建设单位肩负的重大责任。为此,分析了大型水电工程建设期间社会稳定风险的类型,介绍了稳定风险防控的工作机制,猴子岩水电站工程所采取的依法依规建设本质安全稳定型工程、建立健全应急预案、各类稳定事件的应急处置、不稳定事件的预防管理等主要措施,确保了工程建设期的安全稳定。The stability risk during the construction of large hydropower project has been concerned and emphasized increasingly. Maintaining social stability during the construction period is a fundamental guarantee for the successful development of hydropower projects, and is also a major responsibility of the owners of hydropower development. The types of social stability risk during the construction of large hydropower project are analyzed herein, and the working mechanism for stability risk prevention and control are introduced. The main measures for stability risk prevention and control in the construction of Houziyan Hydropower Station Project are also introduced, including constructing intrinsical safe and stable project according to laws and regulations, establishing sound emergency plans, emergency treatment of various types of unstable events, and prevention and management of unstable events, which ensure the safety and stability of project during construction period.

关 键 词:风险防控 社会稳定 水电工程 猴子岩水电站 

分 类 号:C919[经济管理] TV741[社会学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象