检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:朱永国 严军 ZHU Yongguo; YAN Jun(Guodian Dadu River Hydropower Development Co., Ltd., Chengdu 610041, Sichuan, China)
机构地区:[1]国电大渡河流域水电开发有限公司,四川成都610041
出 处:《水力发电》2018年第11期56-59,共4页Water Power
摘 要:猴子岩面板堆石坝是目前世界第二高面板堆石坝,河谷特别狭窄,设计过程中遵循"变形控制+变形协调"、"全生命周期设计"两大设计理念。在狭窄河谷高面板坝变形控制与变形协调技术的探索中,取得"河床趾板设置基座混凝土结构、取消坝体次堆石区、混凝土面板设置永久水平缝、新型监测技术、低热水泥配置面板混凝土、施工期坝体分级抽排水"等多项技术创新成果,可供200 m级或更高面板堆石坝的设计借鉴。The Houziyan Dam is the second highest CFRD in the world. As located in special narrow valley, two design concepts of "Deformation control + deformation coordination" and "Full life cycle design" are followed in its design. The dam construction has achieved several technological innovations about deformation control and deformation coordination of high CFRD at narrow valley, such as setting backfill concrete structure for the foundation of toe slab at riverbed, cancelling secondary rockfill area, setting permanent horizontal joints for concrete face, new monitoring technology, using low heat cement for panel concrete, and graded pumping and drainage of dam body during construction. These achievements are worthy of design reference for 200 m-high or higher CFRD.
关 键 词:混凝土面板堆石坝 设计理念 技术创新 猴子岩水电站
分 类 号:TV641.43[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.87