猴子岩水电站面板堆石坝趾板设计  被引量:3

Toe Slab Design of Concrete Face Rockfill Dam for Houziyan Hydropower Station

在线阅读下载全文

作  者:索慧敏 窦向贤 何兰 SUO Huimin; DOU Xiangxian; HE Lan(PowerChina Chengdu Engineering Corporation Limited, Chengdu 610072, Sichuan, China)

机构地区:[1]中国电建集团成都勘测设计研究院有限公司,四川成都610072

出  处:《水力发电》2018年第11期64-66,99,共4页Water Power

摘  要:猴子岩水电站混凝土面板堆石坝地处狭窄河谷,两岸地形不对称,河谷宽高比约1. 25,最大坝高223. 5 m,为目前世界第二高混凝土面板堆石坝,趾板结构布置和结构设计存在一定难度。为此,结合猴子岩水电站坝址区地质地形条件及工程特点,概括和阐述了猴子岩混凝土面板堆石坝趾板的布置、定线、宽度、厚度、趾板混凝土、分缝、配筋、河床趾板回填基础(趾墙)、趾板基础处理等设计成果,为类似工程提供参考。The dam of Houziyan Hydropower Station is the second highest concrete face rockfill dam in the world with a height of 223. 5 m. The dam is located in the narrow valley, where the terrain on both sides is asymmetric and the ratio of width and height of valley is about 1. 25. There are some difficulties in layout and structure design of toe slab. Based on the geological and topographic conditions of dam site and project characteristic, the design of dam toe slab is introduced from the aspects of layout, base line selection, width, thickness, concrete, joints, reinforcement, backfill foundation (toe wall) at riverbed, and foundation treatment for providing reference to similar engineering.

关 键 词:趾板设计 回填基础 基础处理 猴子岩水电站 

分 类 号:TV641.43[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象