检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:吴永光 WU Yongguang(China Huanqiu Constructing & Engineering Co.,Ltd.,Beijing 100012,China)
出 处:《石油工程建设》2018年第B09期69-72,共4页Petroleum Engineering Construction
摘 要:开展LNG接收站大型LNG储罐的工厂化预制具有较高的经济性。以中国寰球工程有限公司开展16万m^3 LNG储罐的工厂化预制为例,分析了可开展工厂化预制的具体项目,着重进行了桩基、拱顶钢结构、内罐壁板和加强圈的工厂化预制与现场常规预制的经济性比较,以及储罐单台预制造和多台预制的经济性比较。表明LNG储罐工厂化预制和多台预制在提高功效、节约成本和提高EPC管理水平方面有重要作用。Factory prefabrication of large LNG storage tanks of LNG terminal is economical. Taking the factory prefabricationof 160 000m^3LNG tanks of China Huanqiu Constructing & Engineering Co.,Ltd. for example,this paper analyzes thespecific items of the LNG tank factory prefabrication,puts emphasis on the economic comparison between the factoryprefabrication and the field prefabrication with respect to pile foundation,vault steel structure,internal wall and reinforcingring of the LNG tank,also between the single tank prefabrication and multi-tank prefabrication. The results show that theLNG tank factory prefabrication and multi-tank prefabrication play an important role in improving efficiency,saving cost andimproving EPC management.
分 类 号:TE972[石油与天然气工程—石油机械设备]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145