检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王珂 王鹏程 WANG Ke;WANG Pengcheng(Shanxi Hepo Power Generation Co.,Ltd.,Yangquan,Shanxi 045000,China)
机构地区:[1]山西河坡发电有限责任公司,山西阳泉045000
出 处:《山西电力》2018年第5期53-55,共3页Shanxi Electric Power
摘 要:河坡发电公司1号、 2号锅炉为我国首批350 MW超临界循环流化床锅炉。自2016年1月相继投产以来,锅炉在带大负荷时,标高48~52 mm尾部烟道处存在烟道振动,连同包墙过热器、钢梁、平台同时振动,严重影响机组的安全稳定运行。通过就地试验测量及理论分析,确定了锅炉尾部烟道振动的原因,并制定了相应的改造方案,烟道经整改后,振动明显减弱,取得了良好的效果。The No. 1 and No. 2 boilers of Hepo Power Generation Company are the first batch of 350 MW supercritical circulating fluidized bedboilers in China. Since they were put into operation in January 2016, the boiler has had flue vibration at the end of the 48~52 mm tail flue when itwas with large load, and the steam-cooled wall, steel beam and the platform also suffered vibration simultaneously, which seriously affected the safeand stable operation of the unit. Through local test and theoretical analysis, the cause of the flue tail vibration was determined, and the correspondingmodification plan was formulated. After the flue was retrofitted, the vibration was obviously weakened and good results were obtained.
分 类 号:TK229.66[动力工程及工程热物理—动力机械及工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222