检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:杨水才 吴中行 孙立平 YANG Shuicai;WU Zhongxing;SUN Liping(Water Conservancy Bureau of Wuyishan City,Wuyishan 354300,China;School of Water Resources and Hydropower Engineering,Wuhan University,Wuhan 430072,China)
机构地区:[1]武夷山市水利局,福建武夷山354300 [2]武汉大学水利水电学院,湖北武汉430072
出 处:《水电与新能源》2018年第11期11-12,18,共3页Hydropower and New Energy
摘 要:结合武夷山市温林二级电站和温林三级径流电站的实际情况,对其在不同降雨条件下的联合运行方式进行分析,探讨解决防洪与兴利、调峰与水资源高效利用间矛盾的最优方案,保障温林二级电站和温林三级径流电站的安全、经济运行。Considering the actual situations of Wenlin 2 Hydropower Station and Wenlin 3 Runoff Hydropower Station in Wuyishan City, the joint operation of these two stations under different rainfall conditions is analyzed. The purpose is to find an optimal operation mode to balance the flood control, peak load regulation and water resources utilization, and to ensure the safe and economical operation of these two stations.
分 类 号:TV93[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.71