检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:董小卫 田志华 南荣丽 舒博钊 韩光耀 赵文龙 许轲 DONG Xiaowei;TIAN Zhihua;NAN Rongli;SHU Bozhao;HAN Guangyao;ZHAO Wenlong;XU Ke(Engineering Technology Research Institute,Xinjiang Oilfield Company,Karamay 834000,China)
机构地区:[1]新疆油田工程技术研究院,新疆克拉玛依834000
出 处:《石油矿场机械》2018年第6期52-55,共4页Oil Field Equipment
基 金:中国石油天然气股份有限公司重大专项"水平井体积压裂及"工厂化"作业技术"部分内容(2012E-34-14)
摘 要:水平井裸眼分段压裂技术作为致密油藏开发的主要方式之一,近年来获得了广泛应用。油井开采后期,措施井由自喷采油阶段转入下泵抽油阶段,在转抽作业过程中,井口极易发生落物入井,造成井筒过液通道堵塞,甚至落物以下井筒报废。同时,致密油含蜡量高,定期热洗清蜡作业会对储层产生严重伤害。研制了水平井井下防掉热洗阻漏集成器。介绍了方案的设计思路、集成器结构与原理、配套液压丢手工具和打捞工具。该技术可在确保不影响油气井正常生产的前提下,集井下防落物、热洗防漏的功能为一体,有效地弥补了裸眼分压工艺后续配套技术措施。现场推广应用8口井,取得了良好的效果。Open hole horizontal well staged fracturing technology as one of the important ways of the tight oil reservoir development has been widely applied in recent years. During the well ex ploitation later period, the wells will step from the flowing production phase into the oil pumping phase, in which the objects failings into the wells could easily happen at the wellhead and it will cause the wellbore fluid channels blocking, even the wellbore scrappages. The tight oil with high paraffin content and the paraffin removal by hot washing on a regular basis could lead to the seri ous damage to the reservoir. The design ideas, the structure and principle, hydraulic releasing and the fishing tool of integrator for the prevention and leakage proof during hot washing in the downhole of horizontal wells have been introduced. It ensures the normal production of oil and gas wells, provides a comprehensive solution of downhole fall prevention and hot wash leakage proof functions, effectively completes the open hole staged refracturing technology and has been site applied in 8 wells with favorable effects .
分 类 号:TE934.2[石油与天然气工程—石油机械设备]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.26