检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王晓[1] 李广伟 Wang Xiao;Li Guangwei(Shandong Electric Power Engineering Consulting Institute Co.,Ltd.,250013,China;China Power Hua Chuang Electricity Technology Research Shanghai 200086,China)
机构地区:[1]山东电力工程咨询院有限公司,济南250013 [2]中电华创电力技术研究有限公司,上海200086
出 处:《发电设备》2018年第6期442-446,共5页Power Equipment
摘 要:以660MW超超临界机组主蒸汽管道和再热热段蒸汽管道为研究对象,从管材用量、造价和蒸汽阻力三方面对母管制和双管制管道布置方式进行比较。结果表明:双管制布置方式全面优于母管制布置方式,可为今后类似工程设计提供参考。Taking the main and hot reheat steam piping of a 660 MW ultra-supercritical unit as the object of study, a comparison was made between the header-lateral layout and double-branch layout on the aspects of tube material consumption, cost of manufacture and steam flow resistance, etc. Results show that the double-branch layout is comprehensively better than the header-lateral one, which therefore may serve as a reference for engineering design of similar projects.
关 键 词:超超临界机组 管道布置 母管制 双管制 蒸汽阻力
分 类 号:TM621.72[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117