检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:田文香[1]
机构地区:[1]泰戈特(北京)工程技术有限公司,北京100022
出 处:《煤炭加工与综合利用》2018年第11期63-66,共4页Coal Processing & Comprehensive Utilization
摘 要:论述了大型选煤厂EPC总承包项目投标报价过程中影响投标报价的主要因素、应当考虑的项目风险以及采取的报价策略等;并结合多年总承包项目的管理经验及投标报价体会提出了几点建议:工程造价人员要善于及时搜集整理资料,工程项目的参与者特别是业主要树立建设项目全生命周期造价管理的理念,总承包单位要不断提高适应EPC项目的建设模式和项目的报价决策能力,提高EPC项目的投标报价水平。The main affecting factors during the bidding quotation process of EPC large coal preparation plant project are discussed. The risk of project and the quotation strategy should be considered during the bidding quotation,and several suggestions are put forward based on multi-year management experience and bidding practice of general contracting project.The engineering cost personnel should be good at collecting and arranging the cost data. The participants of the project,especially the buyer,mainly establish the life-cycle concept of cost management in construction project. The general contractor must continuously improve the adaptability of the EPC construction mode, the decision-making ability of project quotation and the bidding quotation skill of EPC project.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.227