检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:胡明明[1,2,3] 周辉 张勇慧[1,2] 张传庆 高阳[1,2] 胡大伟 李震[4] HU Ming-ming;ZHOU Hui;ZHANG Yong-hui;ZHANG Chuan-qing;GAO Yang;HU Da-wei;LI Zhen(State Key Laboratory of Geomechanics and Geoteehnical Engineering,Institute of Rock and Soil Mechanics,Chinese Academy of Sciences,Wuhan,Hubei 430071,China;University of Chinese Academy of Sciences,Beijing 100049,China;Department of Civil Engineering,Hefei University,Hefei,Anhui 230601,China;School of Civil Engineering,Henan Polytechnic University,Jiaozuo,Henan 454000,China)
机构地区:[1]中国科学院武汉岩土力学研究所岩土力学与工程国家重点实验室,湖北武汉430071 [2]中国科学院大学,北京100049 [3]合肥学院建筑工程系,安徽合肥230601 [4]河南理工大学土木工程学院,河南焦作454000
出 处:《岩土力学》2018年第11期4218-4225,共8页Rock and Soil Mechanics
基 金:国家重点研发计划资助(No.2018YFC0809600);国家自然科学基金重大科研仪器研制项目(No.51427803);中国科学院青年创新促进会资助;武汉市"黄鹤英才(科技)计划"资助项目;安徽省重点研究与开发计划(No.1804a0802206)~~
摘 要:针对常规沿空留巷技术在工作面回采速度和采空区作业危险性方面存在的局限性,提出了一种新型沿空留巷技术——宽断面预留墩柱沿空留巷技术,该技术的实施步骤为:首先掘进一条宽断面巷道,随后在巷道断面中心安设一排墩柱,墩柱的一侧为本工作面的运输巷,另一侧作为下一工作面的轨道巷,墩柱作为巷旁支护体使下一工作面的轨道巷保留下来以供使用。结果表明:在掘巷时设立墩柱能够维持宽断面巷道围岩的稳定,同时避免了传统沿空留巷在工作面后方作业,安全性得到了较大提高。在巷道掘进阶段,采用二次成巷技术和锚杆-墩柱联合支护技术可保证巷道的稳定;在留巷阶段,高强度的墩柱对沿空留巷顶板的切断和支撑有较好的控制效果,当墩柱间距为1.5 m时,切顶所需墩柱阻力为21.53 MPa,小于墩柱抗压强度(42 MPa),墩柱承载力满足沿空留巷要求,顶底板相对移近量为652 mm,墩柱压缩量最大值为164 mm,墩柱能起到一定让压作用,同时对顶板有较好的支撑,可以很好地适应沿空留巷顶板活动规律,现场应用效果良好。Conventional gob-side entry retaining technology has some limitations, such as mining speed restriction and risks of working in the goaf. In this study, we proposed a modified gob-side entry retaining technology named pier column reserving technology in the wide roadway. First, a wide roadway is excavated, and a row of pier columns are established in the middle of the roadway. One side of pier columns is the conveyance roadway of the working face, and the other side is the rail roadway of next working face. Then the rail roadway with the support of pier columns can be retained to use for the next working face. The results show that the pier columns can maintain the stability of surrounding rock during roadway drivage. Meanwhile, the safety is improved greatly by avoiding working behind the working face. During the roadway excavation, the technology of roadway secondary excavation and the bolt-column combined support are used to guarantee the roadway stability. At the stage of gob-side entry retaining, the high strength pier columns have great performance on roof cutting and supporting. When the distance between pillars is 1.5 m, the required pressure of pier column for roof cutting is 21.53 MPa, which is lower than the compression strength of pier columns. The bearing capacity of the pier column meets the requirements of gob-side entry retaining. The relative displacement of the top and bottom plates is 652 mm, and the maximum convergence of pier column is 164 mm. The pier column can play a certain role in relieving pressure and has good support to the roof, which can be well adapted to the roof activity law of gob-side entry retaining.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117