作 者:王全明[1] WANG Quanming(Jincheng Coal Industry Group Zhaozhuang No.2 Well,Jincheng 048000,China)
机构地区:[1]晋城煤业集团赵庄二号井,山西晋城048006
出 处:《煤矿安全》2018年第11期80-83,共4页Safety in Coal Mines
摘 要:针对赵庄煤业1307大采高工作面软弱复合顶板容易发生冒顶的工程实际,依据现场观察和数值模拟分析了片帮冒顶的关键因素,采用两煤巷超前深孔预注浆加固方案,分析了合理的加固层位和最佳注浆时机,最后选用高渗透时效性注浆材料进行注浆加固。注浆完毕后工作面片帮冒顶得到明显改善,大幅减少了化学浆使用量,实现了安全快速回采。For the actual project that 1307 large mining face of Zhaozhuang Coal Industry has a weak composite roof which is easy to collapse, according to the scene observation and the numerical simulation, the key factors of roof collapsing is analyzed, and the reinforcement scheme of pre-grouting in advanced deep hole of two coal roadways is adopted, and the reasonable reinforcement layer and the best grouting time are analyzed. A kind of grouting material with high permeability is selected to carry out grouting reinforcement. After the grouting, the rib spalling and roof fall of the working face were obviously improved, the amount of chemical slurry was greatly reduced, and the safe and rapid recovery was realized.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.118.226.34