检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国电建集团北京勘测设计研究院有限公司,北京100024
出 处:《四川水力发电》2018年第6期82-86,共5页Sichuan Hydropower
摘 要:苏洼龙水电站是金沙江上游以发电为主要任务的大型水电工程。坝址河床覆盖层深厚,地震烈度高,社会环境复杂。在枢纽布置格局比选中,根据坝址的地形地质条件,分析了工程环境影响、工程安全,采用泄洪建筑物和引水发电建筑物两岸分置的枢纽布置格局。Suwalong hydropower station is a large-sized hydropower project in upper reach of the Jinsha River. Its main purpose is power generation. The dam site overburden is very thick,the earthquake intensity is high and the social environment is complex. In comparison and selection of project layouts,project environment impacts and project safety are analyzed based on topographical and geological conditions in dam site.Therefore,flood discharge structures and headrace and power generation structures are located in both banks respectively.
关 键 词:地质条件 布置特点 布置原则 坝型选择 布置方案
分 类 号:TM622[电气工程—电力系统及自动化] TV61[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.134.95.211