检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:夏晓辉 苏振民[1] 金少军[2] XIA Xiaohui;SU Zhenmin;JIN Shaojun(Nanjing Tech University,Nanjing 211800,China;Construction Engineering Quality Supervision Department of Jiangsu Province,Nanjing 210036,China)
机构地区:[1]南京工业大学,江苏南京211800 [2]江苏省建设工程质量监督总站,江苏南京210036
出 处:《建筑经济》2018年第12期26-30,共5页Construction Economy
摘 要:介绍精益建造体系下的两种施工生产计划与控制方法,即LPS和LBMS。分析两者结合的可行性,构建出基于LPS和LBMS的计划与控制体系框架,进一步阐述其运行流程。最后分析基于LPS和LBMS的计划与控制体系的优势,旨在提高计划的可靠性和稳定性、实现计划的科学预控和有效指导现场施工。This paper introduces two construction production plan and control methods of LPS and LBMS respectively under lean construction system. Then, analyzes the feasibility of the integration of two methods,constructs the framework of plan and control system based on LPS and LBMS, and further expounds its operation process. Finally, analyzes the advantages of plan and control system based on LPS and LBMS, in order to improve the reliability and stability of the plan, realize the plan scientifically and guide the site construction effectively.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.191.160.52