作 者:李亭[1,2] 周国庆 刘书幸[1,2] 王建州 鲍强 酒逢源[2] 王密田 徐敬豪 LI Ting;ZHOU Guoqing;LIU Shuxing;WANG Jianzhou;BAO Qiang;JIU Fengyuan;WANG Mitian;XU Jinghao(State Key Laboratory for Geomechanics and Deep Underground Engineering,China University of Mining and Technology,Xuzhou,Jiangsu 221116,China;School of Mechanics & Civil Engineering,China University of Mining and Technology,Xuzhou,Jiangsu 221116,China;Gansu Civil Engineering Scientific Research Institute,Lanzhou,Gansu 730020,China)
机构地区:[1]中国矿业大学深部岩土力学与地下工程国家重点实验室,江苏徐州221116 [2]中国矿业大学力学与土木工程学院,江苏徐州221116 [3]甘肃土木工程科学研究院,甘肃兰州730020
出 处:《中国矿业大学学报》2018年第4期754-759,共6页Journal of China University of Mining & Technology
基 金:国家重点基础研究发展计划(973)项目(2012CB026103);高等学校学科创新引智计划(111)项目(B14021);国家自然科学基金项目(41271096;51104146;51374199);优秀国家重点实验室研究项目(51323004);国家级大学生科研创新项目(201510290061;201710290009)
摘 要:为研究桩锚支护体系中锚杆在冬季冻胀作用下的作用机理,保障深季节冻土区基坑越冬施工的安全,采用物理模拟试验方法和准分布式光栅串测试技术,研究了锚杆受力随着冻深发展的演化规律.结果表明:冻结初期,随着冻结时间增加,冻深基本呈现线性增加规律(33.6μm/min);冻结变形增大之前,即冻结前期230min内,会经历一个锚杆应变整体缩小的阶段,即冻缩现象,最大冻缩应变量约200×10-6;冻结过程中,从自由段到锚固段,随着锚杆受到的约束不断增大,锚杆变形逐渐减小.桩锚支护体系中锚杆的受力随着环境温度的改变会经历受力反复增减的过程,且冻结引起的锚杆受力大约是静止阶段的10倍以上,需要考虑冻结对桩锚支护体系整体稳定性影响.To ensure the safety of the deep foundation construction in seasonally frozen soil region,the mechanism of deep foundation pit supporting system with anchors and piles under frost heaving during winter was studied by adopting the method of physical simulation and FBG grating array tests.The evolution of anchor rod acting force with the development of frozen depth was also investigated.Results show that at the early stage of freezing,the frozen depth increases linearly with the frozen time at 33.6μm/min.Before the freezing deformation enlarges,namely during the early 230 min,it usually experiences a freezing shrinkage like an overall shrinking phase,with the maximum freezing shrinkage of about 200 micro-strain.From thefree section to anchoring section,the bolt deformation decreases along the growing constraints in the process of freezing.In conclusion,the bolt force of deep foundation pit supporting system with anchors and piles usually goes through a process of repeated changes along the variation in ambient temperature,and the bolt force caused by freezing is about 10 times more than that in the stationary phase.Therefore,the effect of freezing on integral stability of pile-anchor support system should be considered.