检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:黄仲均 刘佳伟 HUANG Zhong-jun;LIU Jia-wei(Shenzhen Water Investment Co.Ltd.,Shenzhen 518031,China)
机构地区:[1]深圳市水务投资有限公司,广东深圳518031
出 处:《中国给水排水》2018年第22期82-85,共4页China Water & Wastewater
摘 要:原产水量为0. 5×10~4m^3/d的赤岭水厂采用传统絮凝+沉淀+过滤工艺,现需要将产水量提升至2×10~4m^3/d。由于厂区面积小、构筑物平面分布不规则,空地面积有限,不具备建设常规混凝土工艺处理构筑物的条件,因此,水厂改造扩能采用了占地少、系统集中程度高、管理运行方便同时又节约投资成本的一体化净水装置。扩建后出水水质达到《生活饮用水卫生标准》(GB5749—2006)。采用一体化净水装置解决了改造扩能与用地紧张的矛盾,并且具有自动化程度高、建设时间短的优点。The traditional flocculation/precipitation/filtration process was adopted in the original Chiling waterworks. The treatment capacity has to be increased from the original 5 000 m3/d to 20 000 m3/d according to the water demand of residents. Due to the limited open space and irregular planar distribution of structures of the original waterworks, it was hard to construct conventional concrete structures. Therefore, an integrated water purification device with less occupation, high system concentration, convenient management and operation, and low investment cost, was adopted in the transformation and expansion project of waterworks. After expansion, the treated water quality met the requirements of the Standards for Drinking Water Quality (GB 5749 -2006). The integrated water purification device has solved the contradiction of expansion and land use tension, and has the advantages of high automation and short construction time.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.112