黑岱沟与哈尔乌素露天煤矿自营剥离设备调配方案优化研究  被引量:1

Study about Allocation Scheme Optimization of Self-operation Stripping Equipment in Heidaigou and Haerwusu Opencast Coal Mines

在线阅读下载全文

作  者:王炜[1] 王桂林[1] 翟正江[1] WANG Wei;WANG Guilin;ZHAI Zhengjiang(Production Technology Department,Shenhua Jungar Energy Limited Liability Company,Ordos,Inner Mongolia,010300)

机构地区:[1]神华准格尔能源有限责任公司生产技术部,内蒙古鄂尔多斯010300

出  处:《神华科技》2018年第10期22-25,41,共5页Shenhua Science and Technology

摘  要:在详细分析黑岱沟与哈尔乌素露天煤矿现有主采设备能力的基础上,以两矿采矿权界为依据,研究相邻露天煤矿工作线长度变化对两矿剥离量的影响。根据近5年两矿剥离具体情况,提出合理的协调开采及设备调配方案。On the basis of detailed analysis of the existing main mining equipment capacity of Heidaigou and Halwusu opencast coal mines, and based on the mining rights boundary of the two mines, influence of the length change of the work line in adjacent open pit coal mines on stripping amount of two mines is studied. According to the specific situation of two mines" stripping in recent 5 years, a reasonable coordinated mining and equipment allocation scheme is put forward.

关 键 词:设备生产能力 采矿权界 开采境界 设备调配 协调开采 

分 类 号:TD824.3[矿业工程—煤矿开采]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象