出 处:《人民长江》2002年第S1期82-86,共5页Yangtze River
摘 要:Based on the practices of construction supervision to cement grouting at the reservoir emptying and power tunnels of the TSQ stage Ⅰ Hydropower station, some issues on quality control of cement grouting of hydraulic tunnel are discussed, and corresponding suggestions are put forward for revision of current standard (SL62-94). It is regarded that the refilling grouting could not be used for remedying the thickness of concrete lining; the end sealing of refilling grouting section should not be neglected; higher grouting pressure would be used. For the consolidation grouting, grout return pipe should be placed at the grout hole top for pure pressure type grouting; five-grade water cement ratio of grout mix is suggested; a certain standard should be specified for changing the grout to thicker mix by skipping the intermediate grade; the standard for ending the grouting should be relaxed. In current grouting standard, some terms should be complemented for contact grouting of steel penstock and spiral case and for plug grouting of circular-anchor hole.Based on the practices of construction supervision to cement grouting at the reservoir emptying and power tunnels of the TSQ stage Ⅰ Hydropower station, some issues on quality control of cement grouting of hydraulic tunnel are discussed, and corresponding suggestions are put forward for revision of current standard (SL62-94). It is regarded that the refilling grouting could not be used for remedying the thickness of concrete lining; the end sealing of refilling grouting section should not be neglected; higher grouting pressure would be used. For the consolidation grouting, grout return pipe should be placed at the grout hole top for pure pressure type grouting; five-grade water cement ratio of grout mix is suggested; a certain standard should be specified for changing the grout to thicker mix by skipping the intermediate grade; the standard for ending the grouting should be relaxed. In current grouting standard, some terms should be complemented for contact grouting of steel penstock and spiral case and for plug grouting of circular-anchor hole.
关 键 词:hydraulic TUNNEL REFILLING GROUTING CONSOLIDATION GROUTING contact GROUTING hole PLUG GROUTING Tianshengqiao Stage Ⅰ Hydro Power STATION
分 类 号:TV421[水利工程—水工结构工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.129.89.50