模糊层次分析法在某高层建筑基础方案比选中的应用  被引量:4

Application of Fuzzy AHP in a High-rise Building's Foundation Type Selection

在线阅读下载全文

作  者:刘立人 李新刚[1] 杨先寿[2] 唐东兰 

机构地区:[1]贵州中建建筑科研设计院有限公司,贵州贵阳550006 [2]贵州大学资源与环境工程学院,贵州贵阳550025

出  处:《施工技术》2016年第S1期33-37,共5页Construction Technology

摘  要:结合工程实例,对某高层建筑的基础形式从经济性、安全性、适用性、工期、环境影响和施工条件6个影响因素,作为基础方案比选的评价指标,选取模糊层次分析法,利用模糊互补判断矩阵,计算各评价指标相对于目标层的权重和各方案相对于评价指标的权重,建立计算模型,对基础形式方案进行优选。According to a engineering project,taking a high-rise building's foundation type from six factors of the economy,safety,applicability,duration,environmental impact and construction conditions as the selection and evaluation index,selecting fuzzy analytic hierarchy process,applying fuzzy complementary judgment matrix,the weight of each evaluation index relation to the target layer and the weight of each programs relation to the evaluation index were calculated. The calculation model was established,which conducts foundation type scheme selection.

关 键 词:基础 评价指标 模糊层次分析法 模糊互补判断矩阵 

分 类 号:TU470[建筑科学—结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象