检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:弥宏亮[1] 陈祖煜[2] 张发明[2] 杜景灿[1]
机构地区:[1]清华大学水利水电系,北京100084 [2]中国水利水电科学研究院岩土所,北京100044
出 处:《岩土力学》2002年第5期649-653,共5页Rock and Soil Mechanics
摘 要:边坡稳定三维极限分析方法有上限解和极限平衡两种方法。上限解具有理论基础严格,计算安全系数步骤简捷的优点;极限平衡方法较以往的相关成果更为严格,它是二维的Spencer法在三维条件下的扩展。同时使用这两种方法求解安全系数,可以使两种方法各自的局限性得到弥补,并且可以将安全系数限制在一个很小的区间内,获得满足精度要求的解答。通过小湾堆积体工程实例说明了其可行性和实用性。The three-dimensional limit method for slope stability analysis includes the upper bound method and the 3D limit equilibrium method. The upper bound method features in its rigorous theoretical background and simple numerical procedures. The 3D limit equilibrium method is actually an extension of the Spencer Method in 2D area. It provides a more rigorous theoretical background, compared to those already published in the literature. To combine the upper bound method with the 3D limit equilibrium method, the 3D factors of safety can be reasonably bracketed in a small range. Its applications to Xiaowan deposit project show its feasibility and practicality.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3