湿式石灰石-石膏法烟气脱硫中石膏质量的工艺控制因素  被引量:23

The factors controlling gypsum quality in wet limestone(lime)-gypsum flue gas desulfurization

在线阅读下载全文

作  者:李守信[1] 胡玉亭 纪立国 

机构地区:[1]华北电力大学环境工程系,河北保定071003 [2]龙源电力环保技术开发公司,北京100037

出  处:《电力环境保护》2002年第3期5-7,共3页Electric Power Environmental Protection

摘  要:介绍了燃煤电厂在湿式石灰石 (石灰 ) -石膏法烟气脱硫工艺中的脱硫石膏质量控制。从化学机理方面讨论了石膏的结晶过程 ;从石膏的过饱和度、浆液的pH值、结晶温度、氧化空气用量、机械力以及石膏脱水等方面 ,较全面地分析了影响脱硫石膏质量的工艺因素 ,提出了控制参数 。This paper introduces the techniques for controlling the quality of calcium sulfate produced as by-product in a wet limestone(lime)-gypsum flue gas desulfurization technology adopted by electric power plant.The crystallization mechanism of calcium sulfate is discussed.The paper allsidedly analyzes the technological factors to control the quality of the calcium sulfate,such as supersaturation level of calcium sulfate,the pH of lime white,the crystallization temperature,the quantity of oxidation air,the mechanical force and the calcium sulfate dehydration etc.The technological parameters are brought forward.It is a valuable reference for controlling the quality of calcium sulfate.

关 键 词:石灰石 石膏 烟气脱硫 工艺控制 过饱和度 

分 类 号:X701.3[环境科学与工程—环境工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象