曲线箱梁斜腿刚构系杆拱桥剪力滞效应分析  被引量:2

Analysis of Shear Lag Effects of Combination Bridge with Curved Rigid Frame Structure and Tied-Arch Bridge

在线阅读下载全文

作  者:潘建杰[1] 欧阳永金[2] 刘世忠[1] 

机构地区:[1]兰州铁道学院土木建筑学院,甘肃兰州730070 [2]厦门市政建设指挥部,福建厦门361012

出  处:《兰州铁道学院学报》2002年第4期42-45,共4页Journal of Lanzhou Railway University

摘  要:利用SAP通用有限元分析软件 ,采用三维板壳单元模拟连续曲梁及横隔板 ,用实体单元摸拟桥墩 ,三维梁单元模拟扇形吊杆及直线拱肋 ,对一曲线连续箱梁斜腿刚构系杆拱组合体系桥进行三维分析 ,连续弯箱梁剪力滞现象比较突出 。This paper makes three dimensional analysis to the shear lag effects of the construction of the combination bridge with curved continuous rigid frame structure and tied arch bridge, based on SAP finite element common software. And three dimensional shell elements simulate the curved beam and horizontal partition, solid elements simulate bridge pier and three dimensional frame elements simulate fan-shaped boom and rectilinear arched girder. The analysis also shows, shear lag effects of box girder is rather distinct ,which should be seriously taken by engineers.

关 键 词:曲线箱梁 斜腿刚构 系杆拱桥 剪力滞效应 

分 类 号:U448.225[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象