Marx发生器建立时间及抖动实验研究  被引量:11

Experimental research on the Marx-generator building time and jitter

在线阅读下载全文

作  者:杨大为[1] 王有田[1] 单玉生[1] 

机构地区:[1]中国原子能科学研究院,北京102413

出  处:《强激光与粒子束》2002年第5期775-777,共3页High Power Laser and Particle Beams

基  金:国家 8 63惯性约束聚变领域资助课题

摘  要:Marx发生器建立时间及抖动与Marx发生器中球隙开关的工作状态有关 ,同时与开关的触发电压幅值及极性有关。通过实验获得了Marx发生器建立时间及抖动最小时最佳工作状态的相关参数。天光一号电子束加速器从同步机发出指令信号至主Marx输出 ,总的延时及抖动为 (16 2 9± 8.4 )ns,满足MOPA系统建立时间抖动小于 2Building time and jitter of the Marx generator are mainly depend on work state of spark gap switch during operating. Meanwhile they are related to amplitude and polarity of trigging voltage. The paper briefly describes physical process of conductance of gas spark gap switch. In order to minimize building time and jitter, experiments were performed to optimize work state related parameters of the Marx generator. As result, the total building time and jitter are (1629±8.4)ns for Heaven Ι electron beam accelerator. It fills the jitter requirement of MOPA system less than 20ns.

关 键 词:实验研究 MARX发生器 球隙开关 建立时间 抖动 脉冲发生器 电子束加速器 

分 类 号:TN782[电子电信—电路与系统] TL55[核科学技术—核技术及应用]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象