检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《土木工程学报》2002年第5期100-104,共5页China Civil Engineering Journal
摘 要:根据挤扩多支盘混凝土灌注桩 (以下简称多支盘桩 )的现场静载荷试验结果 ,分析多支盘桩的荷载传递机理。试验结果表明 ,随着竖向荷载的增加 ,由上到下各承力盘或分支先后发挥其端承作用 ;各承力盘或分支上、下一定范围内桩侧摩阻力不能发挥出来 ,建议在多支盘桩设计时 ,承力盘或分支间距宜不小于 (4~ 6)d (d为桩径 ) ;对于粉土、粉质粘土 ,桩侧极限摩阻力为 30~70kPa,所对应的极限位移为 5~ 2 0mm ;桩侧极限侧摩阻力和极限位移随土层埋深而增大。在相同条件下多支盘桩的极限承载力比等截面桩高 50 %。A new type of pile with expanded branches and plates under vertical load is proposed in the paper It is developed from the normal bored pile Refer to the results of field test,some researches are performed The bearing mechanism of the proposed pile is discussed in detail Then,the load transfer of the resistance around the pile and the load applied on branches and plates transfered from the top of pile are studied It is found that the bearing capacity of the pile is higher than that of the normal one about 50% It is patented that the new type of pile has higher economical efforts
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3