检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《华中电力》2002年第B09期73-75,共3页Central China Electric Power
摘 要:论述了开展联合反事故演习的重要意义,回顾了华中电网历次联合反事故演习的情况,指出了演习方案的设计依据和所要考察的内容,介绍了演习的组织分工和技术设施。最后,提出了搞好反事故演习、保障电网安全稳定运行的建议。The significant meaning of carrying on united anti-contigency practice is discussed,and each practice of Central China electric power system is reviewed in this article.Subsequently,the design bases of the prac tice scheme and the content which the practice scheme ought to examine are put forward.Then,the orgnizing,divi sion of work and technical equipments of the practice are introduced.Finally,a few proposals are suggested to hold united anti-contigen-cy practice more successfully and to ensure the security and stabilization operation of the power system.
分 类 号:TM732[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3