检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张鹤
机构地区:[1]上海市市政工程建设发展有限公司,上海200025
出 处:《中国市政工程》2016年第4期59-61,共3页China Municipal Engineering
摘 要:上海嘉闵高架工程上部结构和下部结构(盖梁、立柱)全面采用预制装配工艺,为城市高架全预制化的推广运用作出有益尝试。下部结构的预制装配实际工程应用案例并不多,因此嘉闵高架预制立柱的施工工艺,特别是现场安装工艺是重要的关键技术环节。针对嘉闵高架工程预制立柱的现场安装工艺进行总结,可供类似工程借鉴参考。Shanghai Jiamin Viaduct project is adopting prefabricated assembly technique totally on its superstructure and substructure(bent cap and column),which has made beneficial attempt for the promotion & application of urban viaduct total prefabrication.Due to less practical application cases of substructure prefabricated projects at present,the construction technique of Jiamin Viaduct prefabricated column especially the in-situ installation technique is the important key technique.The in-situ installation technique of Jiamin Viaduct prefabricated column is summarized,which can provide references for similar projects.
关 键 词:预制立柱 立柱翻转 调整定位 套筒灌浆 测量控制
分 类 号:U445.4[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15