上海嘉闵高架工程预制立柱现场安装定位技术  被引量:6

Field Installation & Positioning Technique of Prefabricated Column in Shanghai Jiamin Viaduct Project

在线阅读下载全文

作  者:张鹤 

机构地区:[1]上海市市政工程建设发展有限公司,上海200025

出  处:《中国市政工程》2016年第4期59-61,共3页China Municipal Engineering

摘  要:上海嘉闵高架工程上部结构和下部结构(盖梁、立柱)全面采用预制装配工艺,为城市高架全预制化的推广运用作出有益尝试。下部结构的预制装配实际工程应用案例并不多,因此嘉闵高架预制立柱的施工工艺,特别是现场安装工艺是重要的关键技术环节。针对嘉闵高架工程预制立柱的现场安装工艺进行总结,可供类似工程借鉴参考。Shanghai Jiamin Viaduct project is adopting prefabricated assembly technique totally on its superstructure and substructure(bent cap and column),which has made beneficial attempt for the promotion & application of urban viaduct total prefabrication.Due to less practical application cases of substructure prefabricated projects at present,the construction technique of Jiamin Viaduct prefabricated column especially the in-situ installation technique is the important key technique.The in-situ installation technique of Jiamin Viaduct prefabricated column is summarized,which can provide references for similar projects.

关 键 词:预制立柱 立柱翻转 调整定位 套筒灌浆 测量控制 

分 类 号:U445.4[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象