特高压直流输电工程大型调相机组质量管控实施路线探讨  被引量:4

Research on Implementation Approach of Quality Control for the High-rating Condenser in UHVDC Project

在线阅读下载全文

作  者:游力[1] 吴磊[2] 张明[1] 王卫涛[1] YOU Li;WU Lei;ZHANG Ming;WANG Weitao(State Grid Hubei Electric Power Research Institute, Wuhan Hubei 430077, China;Huaneng Wuhan Power Generation Co. Ltd.,Wuhan Hubei 430415, China)

机构地区:[1]国网湖北省电力公司电力科学研究院,湖北武汉430077 [2]华能武汉发电有限责任公司,湖北武汉430415

出  处:《湖北电力》2016年第5期20-23,共4页Hubei Electric Power

摘  要:为保证特高压直流输电工程配套大型调相机组的高效投产、安全运行,发挥其在交直流混联电网中的无功支撑作用,针对大型调相机组设备选型、制造、监造等方面的质量管控实施路线进行了探讨。本项目的实施可为特高压直流输电工程大型调相机组质量管控提供有效保障,确保工程的高效投产、安全运行,充分发挥其在交直流混联电网中的无功支撑作用。In order to ensure the efficiently execution and the safety operation of the high-rating condenser in ultra high-voltage direct current project, and realize its reactive compensation func?tion in AC/DC hybrid power grid, implementation approach of the equipment selection, production and equipment supervision for high-rating condenser are studied in this article. The implementation of this project can provide effective protection for large generator phase of UHVDC transmission project quality control, to ensure the efficient operation of the project, the safe operation, which gives full play to its reactive power support in AC / DC hybrid power grid

关 键 词:特高压直流输电 大型调相机 质量管控 实施路线 

分 类 号:TM721.1[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象