检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:马淑君 王亦锥 MA Shu-jun;WANG Yi-zhui(China Power Kunming Engineering Corporation Limited, Kunming 650051, Yunnan, China)
机构地区:[1]中国电建集团昆明勘测设计研究院有限公司,云南昆明650051
出 处:《云南水力发电》2016年第6期133-137,共5页Yunnan Water Power
摘 要:系统介绍天生桥一级水电站放空建筑物的工程布置,泄水建筑物的运行方式和指导原则。提供了放空设计的基本资料与主要参数,详细介绍放空水库的计算方法—数解法和图解法,给出了水库放空过程线并对计算成果进行综合评价。The paper gives a systematic introduction to the engineering layout of the water emptying structures,the operation mode and guiding principle of the discharge structures of the Tianshengqiao-1 Hydropower Plant.The paper offered the basic data and principal parameters of the design of reservoir emptying and explained in detail the calculation method of emptying reservoir -- numerical method and graphic method. The paper presented the reservoir emptying curve and made a comprehensive assessment of the calculations.
分 类 号:TV651[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222