石化污水处理场改造项目进度控制问题及应对措施  被引量:2

Brief discussion on schedule control problems of petrochemical sewage treatment farm reconstruction project and countermeasures

在线阅读下载全文

作  者:张广民[1] Zhang Guangmin(Project Management Center of Daqing Petrochemical Company,Daqing 163714,China)

机构地区:[1]大庆石化公司工程项目管理中心,黑龙江大庆163714

出  处:《炼油与化工》2017年第3期70-72,共3页Refining And Chemical Industry

摘  要:根据石化污水处理场改、扩建项目施工特点和难点,针对进度控制过程中存在的问题,提出了建立高效施工组织管理体系,实行"工程量日工作清单"制度、动态跟踪检查、调整计划机制及资源优化合理配置等措施,实现了项目按期完成并投入生产使用。Based on the construction characteristic and difficulty of the reconstruction and expansion project of chemical sewagetreatment farm,and aiming at the problems existed during schedule control,the measures were put forward,such as establishingefficient construction organization and management system,performing the system of“Daily task list of work amount”,mechanismof dynamical tracking,inspecting,adjusting plan and resource’s optimization and rational allocation.The project was completed onschedule and put into production application.

关 键 词:石化污水处理 进度控制 工程量日工作清单 动态跟综 

分 类 号:X703[环境科学与工程—环境工程]

 