检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王成玉[1] 张福行[1] 胡双柏[1] Wang Chengyu;Zhang Fuxing;Hu Shuangbai(Shanghai Baoshan Iron and Steel Co., Ltd. Ironworks, Shanghai 200941,China)
机构地区:[1]上海宝山钢铁股份有限公司炼铁厂,上海200941
出 处:《环境与发展》2017年第4期45-46,共2页Environment & Development
摘 要:在炼焦厂建设项目环境影响评价过程中,通过严格把握国家相关法律法规、产业政策及环保政策,深入了解炼焦生产工艺,掌握炼焦厂的污染特点,提出针对性较强的污染控制措施等技术要点的把握,使评价结果更可靠可信,为建设项目的工程设计和环境管理提供科学依据。In the process of environmental impact assessment of coking plant construction project,through thorough grasp of relevant state laws and regulations,industrial policies and environmental policies,we have a better understanding of coking production technology,grasping the pollution characteristics of coking plants,and put forward targeted pollution control measures.Technical points to grasp,so that the evaluation results more reliable and credible,for the construction of the project design and environmental management to provide a scientific basis.
分 类 号:X822.5[环境科学与工程—环境工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.191.136.109