超大规模光伏发电并网对电网关键潮流断面影响的研究  被引量:4

Study on Influence of Ultra-Large-Scale Grid-Connected Photovoltaic Power System on Key Tide Cross Section of Power Grid

在线阅读下载全文

作  者:冯大伟 程璐[2] 王震泉 FENG Da-wei;CHENG Lu;WANG Zhen-quan(China Energy Engineering Group Jiangsu Power Design Institute Co., Ltd, Nanjing 2111 02, China;School of Electrical Engineering, Xi’an Jiaotong University, Xi’an 710049, China)

机构地区:[1]中国能源建设集团江苏省电力设计院,江苏南京211102 [2]西安交通大学电气工程学院,陕西西安710049

出  处:《电工电气》2017年第7期11-14,19,共5页Electrotechnics Electric

摘  要:以江苏宝应光伏发电基地为例,分析了江苏省电网结构、潮流特征以及江北地区风电光伏出力特性,研究了关键潮流断面特别是500kV过江通道输送能力对大规模光伏并网的影响和限制,利用电力系统分析软件PSD-V2009对并网方案进行仿真计算。随着新能源装机容量的不断增加,江苏北电南送潮流将不断加大,对500kV过江通道的压力也将日趋增加,建议加强江苏北电南送过江通道和江北调峰机组的建设,进一步增强电网可靠性和对新能源发电的接纳能力。Taking Baoying photovoltaic power generation base in Jiangsu province for example,this paper analyzed the power networkstructure and tide characteristic in Jiangsu province and wind power photovoltaic output force characteristic in area north of the YangtzeRiver,researched on the key tide cross section,especially the impacts and impose restrictions of500kV pathway crossing rivers deliverycapacity on ultra-large-scale grid-connected system and used the electric power system analysis software PSD-V2009to carry out simulationcalculation of grid-connected scheme.With the increase of the new energy installed capacity and the north-to-south power transmission tidein Jiangsu province continuously,the pressure of500kV pathway crossing rivers will increase gradually.It is suggested strengthening theconstruction of the north-to-south power transmission pathway crossing rivers in Jiangsu province and the variable load units in area north ofthe Yangtze River,which further enhances the reliability of power grid and the admitting ability of new energy power generation.

关 键 词:光伏发电 光伏出力特性 关键潮流断面 潮流仿真 

分 类 号:TM615[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象