《广东省水利水电工程概(估)算编制规定》修编的必要性分析  被引量:3

Necessity Analysis of the Revision of Regulations on Guangdong Province Water Resources and Hydropower Project Summary(Estimated) Calculation Requirements

在线阅读下载全文

作  者:张忠良[1] ZHANG Zhong-liang(Guangdong Hydropower Planning & Design Institute, Guangzhou 510635, China)

机构地区:[1]广东省水利电力勘测设计研究院,广东广州510635

出  处:《广东水利电力职业技术学院学报》2017年第2期11-13,共3页Journal of Guangdong Polytechnic of Water Resources and Electric Engineering

摘  要:广东省水利厅粤水基[2006]2号文颁发的《广东省水利水电工程概(估)算编制规定(试行)》已实施十年有余,在此期间,该计价规范性文件为规范广东省水利水电工程建设市场行为和加强工程造价管理方面发挥了积极作用。从实用性、适用性、实时性、一致性等方面进行分析,认为该计价文件在一定程度上已经无法满足我省当前水利工程建设需要,应对该计价文件进行全面、系统的修编,并对修编周期、人工预算单价动态调整等问题提出建议。Guangdong Province Water Resources and Hydropower Project Summary(estimated)CalculationRequirements(Trial),issued by Water Resources Department of Guangdong Province in2006,has been in practicefor more than ten years.During this period,this normative document has played a positive role in strengtheningthe project cost management of water conservancy and hydropower project construction.By analyzing thepracticality,applicability,real-time,consistency and other aspects,this paper argues that this pricing documentscannot completely meet the needs of current water conservancy construction and the pricing document should becomprehensively and systematically revised.Furthermore,this paper puts forward suggestions on worker unit priceand other issues.

关 键 词:编制规定 人工预算单价 增值税 独立费用 

分 类 号:TV222[水利工程—水工结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象