检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:闫志铭 YAN Zhiming(Faculty of Coal Resources & Safety Engineering, China University of Mining and Technology, Beijing 100083, China;Yangquan coal industry (Group)Co. Ltd., Yangquan 045000, China)
机构地区:[1]中国矿业大学(北京)资源与安全工程学院,北京100083 [2]阳泉煤业(集团)有限责任公司,山西阳泉045000
出 处:《煤田地质与勘探》2017年第3期45-48,共4页Coal Geology & Exploration
摘 要:针对我国低透气性煤层普遍存在瓦斯抽采效果差的现状,提出了利用大直径长钻孔水力压裂对煤层进行增透的技术措施,探讨了长钻孔水力压裂增透机理,并进行了煤矿井下煤层水力压裂瓦斯抽采试验。在成功施工顺层长钻孔的基础上,研发了一套适合井下水力压裂施工的快速封孔工具组合,分析了压裂过程中参数变化规律,提出了水力压裂影响范围、压裂效果和瓦斯抽采效果评价方法,并进行了考察和评价。研究表明:该技术克服了传统井下水力压裂存在的封孔质量差、压裂影响范围小等问题,压裂后煤层透气性系数提高了2.67倍,压裂最大影响半径达到了58 m,压裂后连续抽采130 d累计抽采纯瓦斯量为31.39万m^3,日最高抽采量2 668 m^3,瓦斯体积分数平均70.05%,百米钻孔瓦斯抽采纯量达到0.55 m^3/min。Aiming at the general poor gas drainage effect of coal seams with low permeability in China,the paper put forward the technical measures of hydraulic fracturing for permeability improvement through large-diameter long boreholes,the mechanism of permeability improvement by hydraulic fracturing in long boreholes was discussed,and gas drainage test using hydraulic fracturing in coal seams in underground coal mines was carried out.On the basis of successful drilling of long boreholes along coal seams,a rapid sealing tool assembly suitable for underground hydraulic fracturing operation was developed.The change law of parameters during fracturing was analyzed,the method for evaluation of the influence range of hydraulic fracturing,the effect of hydraulic fracturing and gas drainage was put forward,investigated and assessed.The research indicated that the technology had overcame the problems existing generally in traditional underground hydraulic fracturing,such as poor hole-sealing quality and small influence range of fracturing.After fracturing,the permeability coefficient of seam increased by2.67times,the maximum influence range of fracturing reached58m,during130d totally31.39×104m3pure gas was drained with the maximum daily extraction of2668m3and the mean gas volume fraction of70.05%,the drained pure gas quantity of100m of borehole was up to0.55m3/min.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.12.148.147