检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:L. Gagarin A. Melnikov V. Ogonerov I. Khristophorov K. Bazhin
机构地区:[1]Melnikov Permafrost Institute SB RAS, Yakutsk 677010, Russia [2]Technical Institute (branch) of North-East Federal University, Neryungri, 678922, Russia
出 处:《Research in Cold and Arid Regions》2017年第4期352-362,共11页寒旱区科学(英文版)
基 金:supported by Russian Foundation for Basic Research (RFBR, Nos. 16-35-60027, 16-35-60028)
摘 要:High seismic activity, difficult permafrost and hydrogeological conditions of South Yakutia(Russia) complicate building and exploitation of engineering construction and require additional detailed and complex research. These conditions are evident within two sites. The first site is located in the middle reach of the Duray River, where it is crossed by the highway Lena. The second site is located on the right side of the Chulmakan River Valley, 400 meters to the east of the ESPO oil pipeline route. Seismic events, occurring four years ago, led to landslides in the mentioned sites. Formation of joint fissures on slopes assisted drainage of aquifers of free water exchange zone. It is worth noting that at the Duray River site, 59 cm of active soil slumping movement towards the roadbed has occurred within two summer months. Such a process is complicated by cryogenic disintegration of rocks in the base of the landslide body due to groundwater discharge and icing formation in winter.High seismic activity, difficult permafrost and hydrogeological conditions of South Yakutia(Russia) complicate building and exploitation of engineering construction and require additional detailed and complex research. These conditions are evident within two sites. The first site is located in the middle reach of the Duray River, where it is crossed by the highway Lena. The second site is located on the right side of the Chulmakan River Valley, 400 meters to the east of the ESPO oil pipeline route. Seismic events, occurring four years ago, led to landslides in the mentioned sites. Formation of joint fissures on slopes assisted drainage of aquifers of free water exchange zone. It is worth noting that at the Duray River site, 59 cm of active soil slumping movement towards the roadbed has occurred within two summer months. Such a process is complicated by cryogenic disintegration of rocks in the base of the landslide body due to groundwater discharge and icing formation in winter.
关 键 词:earthquake PERMAFROST LANDSLIDE ICING groundwater
分 类 号:P315[天文地球—地震学] P642[天文地球—固体地球物理学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49