Hard rock tunnel boring machine penetration test as an indicator of chipping process efficiency  被引量:4

Hard rock tunnel boring machine penetration test as an indicator of chipping process efficiency

在线阅读下载全文

作  者:M.C. Villeneuve 

机构地区:[1]Department of Geological Sciences, University of Canterbury, Christchurch, 8140, New Zealand

出  处:《Journal of Rock Mechanics and Geotechnical Engineering》2017年第4期611-622,共12页岩石力学与岩土工程学报(英文版)

摘  要:The transition from grinding to chipping can be observed in tunnel boring machine(TBM) penetration test data by plotting the penetration rate(distance/revolution) against the net cutter thrust(force per cutter) over the full range of penetration rates in the test.Correlating penetration test data to the geological and geomechanical characteristics of rock masses through which a penetration test is conducted provides the ability to reveal the efficiency of the chipping process in response to changing geological conditions.Penetration test data can also be used to identify stress-induced tunnel face instability.This research shows that the strength of the rock is an important parameter for controlling how much net cutter thrust is required to transition from grinding to chipping.It also shows that the geological characteristics of a rock will determine how efficient chipping occurs once it has begun.In particular,geological characteristics that lead to efficient fracture propagation,such as fabric and mica contents,will lead to efficient chipping.These findings will enable a better correlation between TBM performance and geological conditions for use in TBM design,as a basis for contractual payments where penetration rate dominates the excavation cycle and in further academic investigations into the TBM excavation process.The transition from grinding to chipping can be observed in tunnel boring machine(TBM) penetration test data by plotting the penetration rate(distance/revolution) against the net cutter thrust(force per cutter) over the full range of penetration rates in the test.Correlating penetration test data to the geological and geomechanical characteristics of rock masses through which a penetration test is conducted provides the ability to reveal the efficiency of the chipping process in response to changing geological conditions.Penetration test data can also be used to identify stress-induced tunnel face instability.This research shows that the strength of the rock is an important parameter for controlling how much net cutter thrust is required to transition from grinding to chipping.It also shows that the geological characteristics of a rock will determine how efficient chipping occurs once it has begun.In particular,geological characteristics that lead to efficient fracture propagation,such as fabric and mica contents,will lead to efficient chipping.These findings will enable a better correlation between TBM performance and geological conditions for use in TBM design,as a basis for contractual payments where penetration rate dominates the excavation cycle and in further academic investigations into the TBM excavation process.

关 键 词:Penetration rate GRINDING Chipping Geological characteristics Face stability 

分 类 号:U455.31[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象