检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈学国 CHEN Xue-guo(Ningbo Communication Engineering Construction Group Co., Ltd., Ningbo 315200, China)
机构地区:[1]宁波交通工程建设集团有限公司,浙江宁波315200
出 处:《水运工程》2017年第9期209-213,共5页Port & Waterway Engineering
摘 要:长管节大管桩是近年来开发出的具有抗击打能力强、抗弯性能强、混凝土耐久性高、造价相对较低等特点的优秀桩型,其穿透夹石、夹砂层能力较强,可在一定范围内取代钢管桩。以福州港江阴港区11~#泊位工程为例,采用钢管桩和混凝土长管节大管桩(高强度预应力混凝土管桩+钢桩靴的组合桩)作为桩基,顺利完成沉桩。与传统桩型相比,长管节大管桩的力学性能和成本都具有一定优势。The large diameter cylinder pile with long tube is a kind of excellent pile type that developed in recent years which has good anti-strike and anti-bending ability,high durability and low cost.It can be replaced steel pipe pile in a certain range due to a strong ability to penetrate rock and sand.Taking the No.11berthing project in Jiangyin Port,Fuzhou Port Area as an example,this paper applies the steel pipe pile,and the large diameter cylinder pile with long tube(composite pile of high strength pre-stressed concrete pipe pile+steel pile boots)as the foundation.The sinking pile is successfully completed.Compared with the traditional piles,the mechanical properties and cost of the long tube and large diameter cylinder pile have certain advantages.
分 类 号:U655.551[交通运输工程—港口、海岸及近海工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.195