摘  要:泵站在超低水位下运行时,将引起泵站进水水流流态恶化,危及泵站的安全稳定运行。为了解决这一问题,该文通过对黄河下游田山一级泵站在进水池超低水位下运行时存在的严重不良流态及其对机组造成的危害进行了分析,提出了在进水池设置导流台、水下消涡板和W型后墙导流墩的组合整流措施,应用三维数值计算方法对进水池的水流流态和该组合整流措施下的整流效果进行了数值模拟,并采用透明的进水池模型对数值模拟结果进行了检验。数值计算和模型试验结果表明:组合整流措施消除了进水池表面、池底、边壁的漩涡、回流以及死水区,进水池的水流流态和进水喇叭口的轴向速度分布得到了有效的改善。研究成果可为超低水位下运行的泵站提供参考。In order to ensure the safe and stable operation of pump station when the suction sump is under the ultra-low water level(the ultra-low water level is higher than the pump installation elevation yet lower than the designed low level of the suction sump),the Tianshan first-grade pump station is taken as study object in this paper.Site research shows that when the pump station runs under the ultra-low water level in long time,the noise and vibration of the pump unit are increased,the impeller and blade are severely caved and the normal operation of pump station is affected.In order to solve these adverse effects,the combined rectification scheme is proposed,which consists of diversion platform,underwater vortex suppression plate and W type diversion pier near the back wall.The flow pattern,the velocity distribution and the axial velocity uniformity of bell-mouth inlet under the original scheme and rectified scheme were analyzed through numerical simulation and experimental research respectively.The numerical simulation results showed that violent vortexes appeared on side wall,bottom and surface of the suction sump due to the ultra-low water level and large velocity gradient in suction sump.These vortexes deteriorated the flow pattern in suction sump,and this situation was exacerbated by excessive hanging height and the distance between back wall and water inlet.But a vortex at the bottom and2surface vortexes of the suction sump were completely removed,and the side wall vortex of the suction sump was controlled;the area of backflow and stagnant water shrank dramatically after the combined rectifier scheme was adopted.In addition,the uniformity of axial velocity distribution of bell-mouth inlet was increased from62.3%to87.5%,25.2%higher than before,which greatly improved the water flow pattern in suction sump.In the combined rectifier scheme,the diversion platform eliminated the whirlpool at the bottom of the suction sump,and improved the flow pattern between the bell-mouth and the bottom of the suction sump.The und

关 键 词: 计算机仿真 模型 进水池 超低水位 水流流态 整流措施 试验 

分 类 号:TV675[水利工程—水利水电工程]

 