检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:杨杰 田新荆 卢双龙 YANG Jie;TIAN Xinjing;LU Shuanglong(State Grid Hubei Electric Power Research Institute, Wuhan Hubei 430077, China)
机构地区:[1]国网湖北省电力公司电力科学研究院
出 处:《湖北电力》2016年第12期38-42,共5页Hubei Electric Power
摘 要:针对印度尼西亚某110MW无旁路循环流化床机组主要设计特点,进行了100%负荷下的FCB试验。介绍了FCB试验锅炉侧的主要控制方法,分析了试验中发现的问题,指出了原因并提出了解决办法。结果表明:锅炉侧主要参数均达到要求,锅炉运行稳定,试验实现机组全过程无人为干预带厂用电自动运行5min后快速并网并恢复负荷,试验结果对锅炉运行及当地电网稳定有重要指导意义。FCB test has been performed on the110MW no bypass system CFB boiler.The control methods of the boiler are introduced,and the problems are analyzed,the solutions are made about the problems.The results show that the main parameters of the boiler can meet the requirements of FCB test,and the boiler can operate stably,the unit of the power plant can operate5minutes automatically,and then the unit can connect to the grid and rise load quickly,these results are very helpful to the actual operations of the boiler.
关 键 词:110MW无旁路循环流化床机组 100%负荷FCB试验 锅炉侧控制策略
分 类 号:TK229.66[动力工程及工程热物理—动力机械及工程] TP273[自动化与计算机技术—检测技术与自动化装置]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.124