深部构造应力作用下大断面硐室底鼓控制技术  被引量:7

Floor Heave Controlling Technology of Large Sectional Chamber under Tectonic Stress in Deep

在线阅读下载全文

作  者:颜立新[1] 王涛[1] YAN Li-xin;WANG Tao(Coal Mining & Designing Department,Tiandi Science & Technology Co ,Ltd ,Beijing 100013,China)

机构地区:[1]天地科技股份有限公司开采设计事业部,北京100013

出  处:《煤矿开采》2017年第6期50-53,81,共5页Coal Mining Technology

基  金:国家科技支撑计划课题(2012BAB13B02);国家自然科学基金项目(U1261211);科技创新基金面上项目(2014MS037)

摘  要:为解决深部构造应力作用下大断面水泵房底鼓问题,结合胡底矿地质条件分析了水泵房底板围岩的变形破坏机理,认为底板岩层性质、围岩应力、无支护及大断面是造成泵房底鼓的主要原因。对此,提出锚固前先注浆充填底部围岩裂隙和施工高预紧力全长锚固底板锚索的联合支护方案,利用浆液对裂隙围岩进行结构性补偿,提高破碎围岩的残余强度;高预应力强力锚索支护能改善锚固范围内围岩应力状态,从而提高底板围岩的自承载能力。现场应用表明:盘区水泵房采用超前预注浆和高强预应力全长锚固联合支护技术后,有效控制了盘区水泵房底板变形,保证泵房设备基础安全使用。In order to solve the problem that floor heave of large sectional water pump house under tectonic stress in deep,the deformation and broken mechanism of floor surrounding rock of water pump house was analyzed under the geological situation of Hudi coal mine,the main reasons that induced floor heave were floor stratum characters,surrounding rock stress,nonsupporting and large section So the synthesis supporting method was put forward,which is about surround rock fractures in floor was filled with grouting before anchoring,and then high prestress and fully anchored cable was applied,the fracture surrounding rock was compensated by grouting,so the residual strength of broken surrounding was improved,the stress state of surrounding rock in anchoring scope was improved by high prestress strengthen cable supporting,so the floor surrounding rock bearing capacity was improved The field test showed that,the synthesis method was applied in water pump house,floor deformation was controlled effectively,the safety using of water pump house equipment foundation was ensured

关 键 词:深部构造应力 大断面硐室底鼓 注浆加固 高预应力锚索 

分 类 号:TD353[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象