检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王辉[1] 王明斌 谢兴富 古腾 聂凯翔 吴勇[1] WANG Hui;WANG Ming-bin;XIE Xing-fu;GU Teng;NIE Kai-xiang;WU Yong(State Key Laboratory of Geohazard Prevention and Geoenvironment Protection(Chengdu University of Technology),College of Environmental and Civil Engineering,Chengdu University of Technology,Chengdu 610059,China)
机构地区:[1]地质灾害防治与地质环境保护国家重点实验室(成都理工大学),成都理工大学环境与土木工程学院,成都610059
出 处:《价值工程》2018年第8期136-137,共2页Value Engineering
摘 要:隧道穿越地下暗河时易发生突水突泥灾害,破坏区域水文环境,影响隧道施工和运营.本文介绍了新武隆隧道2#地下暗河的施工处理技术,详细介绍了该暗河的施工处理方法。该方案取得了较好的效果,对类似工程具有借鉴意义。Water and mud disastrous event may happen when tunnel passes through underground river,damaging regional hydrological environment and affecting the construction and operation of the tunnel.This paper introduces the construction technology of2#underground river of Xinwulong tunnel.The program has achieved good results,and can provide a reference for similar projects
分 类 号:U455.49[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.200