检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘立新 LIU Lixin(Anhui MaSteel Equipment Maintenance Co., Ltd., Maanshan, Anhui 243000, China)
机构地区:[1]安徽马钢设备检修有限公司,安徽马鞍山243000
出 处:《冶金动力》2018年第4期68-70,共3页Metallurgical Power
摘 要:侧压机是2500热轧线上重要设备之一,侧压机机架是侧压机的关键部件。它的安装是侧压机安装的关键工序,由于它是各片梁组成,安装就位过程中还需旋转,主梁变形量将直接影响侧压机安装质量,从而影响侧压机工作效果。叙述了吊装过程的技术要点。As the side pressing machine is one of important equipments of the2500hot rolling line and the side press frame is the key part of the side press,installation of the side press frame is the key to the lateral pressure machine installation process.The frame is the composition of all plate beams,so it needs to rotate in the installation process.Any main girder deformation will directly affect the installation quality of lateral pressure machine,thus affect the operation effect of lateral pressure machine.The technical essentials in the installation process are presented.
分 类 号:TG335.11[金属学及工艺—金属压力加工]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.226.159.125