检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:谢秀成 车本方 鲁玉龙 Xie Xiu-cheng;Che Ben-fang;Lu Yu-long(Shandong 75th Coal Production and Construction Mine,Shandong Jining 277699)
出 处:《山东煤炭科技》2018年第3期48-50,共3页Shandong Coal Science and Technology
摘 要:冲击地压工作面超前支护距离大于非冲击地压工作面,传统的巷道支架为3组布置,不能满足冲击地压防治要求。在实践中,综合考虑采用巷道支架与单体支柱混合支护的形式,解决单体支柱支护作业强度大、工效低、巷道支架维护距离短的问题,两者互补,既保证安全又提高工效。The advance support distance of the impact surface pressure working face is greater than that of the non impact surface pressure working face.The traditional roadway support is 3 sets of layout,which can not meet the requirements of the impact ground pressure prevention and control.In practice,considering the form of mixed support of roadway support and monomer pillar support,the problems of monomer pillar support high work intensity,low work efficiency and short maintenance distance of roadway support are solved.They complement each other,which not only guarantees safety but also improves work efficiency.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.36