地铁车辆段过轨给排水管线的设置  被引量:2

The laying ways of the crossing-rail water supply and drainage pipeline of Subway depot

在线阅读下载全文

作  者:杨彩玲 YANG Cailing(Xiamen branch of Beijing Urban Construction Design & Development Group Co., Ltd,Xiamen 361000)

机构地区:[1]北京城建设计发展集团股份有限公司厦门分公司,福建厦门361000

出  处:《福建建筑》2018年第3期57-60,共4页Fujian Architecture & Construction

摘  要:针对地铁车辆段给排水管线过轨问题,结合工程实例,介绍了过轨给排水管线的常用敷设方式有直接埋地敷设、防护套管敷设、架空敷设、综合管沟敷设,说明了不同敷设方式有其不同的适用范围、敷设要求及优、劣势,必须引起地铁工程设计人员慎重选择。In view of the crossing-rail problem of water supply and drainage pipelines in subway depot,this paper introduces some common laying ways of crossing-rail water supply and drainage pipelines combine with subway depot projects,which has direct buried laying,protective casing laying,overhead laying,and integrated trench laying.This paper introduces the different applications,laying requirements,advantages and disadvantages of the different methods,which must be carefully selected by subway engineering designers.

关 键 词:过轨管道 给排水管线 直接埋地敷设 防护套管敷设 架空敷设 综合管沟敷设 

分 类 号:TU991[建筑科学—市政工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象