检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:M.Nehring P.F.Knights M.S.Kizil E.Hay
机构地区:[1]School of Mechanical and Mining Engineering, The University of Queensland
出 处:《International Journal of Mining Science and Technology》2018年第2期205-214,共10页矿业科学技术学报(英文版)
摘 要:In a global environment where energy and labor are becoming increasingly expensive, continuous mining systems such as In-Pit Crushing and Conveying(IPCC) systems have been advanced as offering a real alternative to conventional truck haulage systems. The implementation of IPCC systems in hard rock operations in open pit mines however requires different and more comprehensive planning approaches in order to adequately reflect the practical aspects associated with these. This paper investigates the impact that these approaches may have on the implementation of IPCC systems on a basic metalliferous deposit amenable to open pit exploitation. A strategic life of mine plan to provide numerous economic indicators for each approach is analyzed and compared to traditional truck haulage systems. The mine planning and evaluation process highlights the increased overall resource recovery that may accompany the use of IPCC systems. This investigation also provides insights into the issues associated with IPCC and the scale and type of operation and orebody that is likely to provide a feasible alternative to truck haulage.In a global environment where energy and labor are becoming increasingly expensive, continuous mining systems such as In-Pit Crushing and Conveying(IPCC) systems have been advanced as offering a real alternative to conventional truck haulage systems. The implementation of IPCC systems in hard rock operations in open pit mines however requires different and more comprehensive planning approaches in order to adequately reflect the practical aspects associated with these. This paper investigates the impact that these approaches may have on the implementation of IPCC systems on a basic metalliferous deposit amenable to open pit exploitation. A strategic life of mine plan to provide numerous economic indicators for each approach is analyzed and compared to traditional truck haulage systems. The mine planning and evaluation process highlights the increased overall resource recovery that may accompany the use of IPCC systems. This investigation also provides insights into the issues associated with IPCC and the scale and type of operation and orebody that is likely to provide a feasible alternative to truck haulage.
关 键 词:In pit CRUSHER conveyor SYSTEMS Strategic MINE planning Resource recovery Surface metalliferous mining MINE optimization Truck and SHOVEL
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.38