检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:周建荣[1] 史益鲜 ZHOU Jianrong;SHI Yixian(Taihu River Basin Authority Suzhou Bureau,Suzhou 215011,China)
机构地区:[1]太湖流域管理局苏州管理局,江苏苏州215011
出 处:《水利建设与管理》2018年第2期74-77,共4页Water Conservancy Construction and Management
摘 要:太浦闸10号孔套闸为满足船舶过闸净空的要求,交通桥设计成活动桥面,利用液压同步技术升降。为确保活动桥面升降的可靠性和船舶过闸的安全性,该同步升降系统由液压控制、计算机控制和手动控制三部分组成,并具备多种安全保障措施。本文介绍该系统的组成原理、安全措施和注意事项,可供有关单位借鉴和参考。The traffic bridge is designed into active bridge deck in order to meet the requirements of ship lock clearance in Taipu Brake No.10 hole trunk,and the hydraulic synchronous technology is used for lifting.The synchronous lifting system is composed of three parts of computer control,computer control and manual control in order to ensure the reliability of mobile bridge deck lifting and the safety of the ship lock.Many safety guarantee measures are available.In the paper,the composition principle,safety measures and precautions of the system are introduced as reference and experience for similar units.
关 键 词:活动桥面 液压同步 组成原理 安全措施 注意事项
分 类 号:TV664.2[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117