检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:姚康[1] 罗嗣海[1] 胡世丽[1] 王观石[1,2] 郭阶庆 YAO Kang;LUO Sihai;HU Shili;WANG Guanshi;GUO Jieqing(School of Architectural and Surveying Mapping Engineering,Jiangxi University of Science and Technology,Ganzhou 341000,China;Engineering Research Institute,Jiangxi University of Science and Technology,Ganzhou 341000,China;School of Resources and Environmental Engineering,Jiangxi University of Science and Technology,Ganzhou 341000,China)
机构地区:[1]江西理工大学建筑与测绘工程学院,江西赣州341000 [2]江西理工大学工程研究院,江西赣州341000 [3]江西理工大学资源与环境工程学院,江西赣州341000
出 处:《有色金属科学与工程》2018年第1期98-104,共7页Nonferrous Metals Science and Engineering
基 金:国家自然科学基金资助项目(41602311;51664015;51264008);江西省教育厅科技项目(GJJ150658)
摘 要:离子型稀土矿山在注液强度过大时容易引起滑坡,因此研究临界注液强度有重要意义.通过现场测试表土层、原矿层和尾矿层相关土性参数,基于Geo Studio软件计算了3种工况下注液面积百分比由30%增加到60%时临界注液强度和滑坡剪出口高度的变化规律.结果表明:随着注液面积百分比的增大,临界注液强度先快速减小,后趋于缓慢;滑坡剪出口高度随着注液面积百分比增大而逐渐减小;浸矿使得矿体的临界注液强度减小32%左右;而布置巷道收液工程使得其临界注液强度可达浸矿后的10~7.5倍左右;浸矿对滑坡剪出口高度基本不产生影响,但巷道收液工程可使滑坡剪出口高度增大1.40~1.23倍左右.Ion-absorbed rare earth mines tend to cause landslides when the injection strength is too high,so it is of great importance to study the intensity of critical liquid injection.The relationship among the percentage of injection area and the critical injection intensity as well as the shear outlet height of landslide under three operation conditions was calculated by the GeoStudio software according to the related soil parameters of surface soil layer,raw ore layer and tailings layer tested on the spot.Experimental data indicates that the critical injection intensity decreases rapidly,and then tends to be slow gradually.The shear outlet height of landslides increases rapidly with the increasing of the percentage of liquid injection area.It increases lightly when the percentage of injection area is higher than 60%.The critical injection intensity of the ore body increases by 4.8 to 7 times when the tunnel liquid collection engineering is employed.Mineral-leaching has little effect on the shear outlet height of landslides.However,the height will increase about 18%when the percentage of liquid injection area is higher than 50%.
关 键 词:离子型稀土矿 巷道收液 浸矿 临界注液强度 剪出口高度
分 类 号:TD865[矿业工程—金属矿开采]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.178