检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李科君 康磊 查开鹏 LI Ke-jun;KANG Lei;ZHA Kai-peng(The Third Construction Engineering Company Co.Ltd.of China Construction Second Engineering Bureau,Chengdu 610045,China)
机构地区:[1]中建二局第三建筑工程有限公司,成都610045
出 处:《中小企业管理与科技》2018年第8期165-166,共2页Management & Technology of SME
摘 要:目前,大部分施工单位多数采用两种施工工艺进行施工,即错层法施工、变形缝处填塞泡沫板或是聚苯板等柔性材料。以上两种方法存在质量控制极其困难,混凝土成品质量极差,施工进度缓慢、成本较高等诸多问题。因此采用新型的变形缝模板加固施工新技术迫在眉睫,遵义实地·蔷薇国际项目针对上述变形缝两种传统施工方法进行分析与汇总,设计出变形缝加固与拆除专业锚具并制定出切实可行的施工技术措施方案。At present,most of the construction units adopt two kinds of construction techniques to carry out the construction,that is,the staggered-layer construction,and packing flexible materials such as foam plate or polystyrene plate at the deformation joint.There are many problems existing in the above two methods,such as the quality contro is extremely difficult,and the quality of the finished concrete is very poor,construction progress is slow,high cost and so on.Therefore,it is imminent to adopt a new deformation joint template reinforcement construction technology.Zunyi Shidi.Qiangwei international project analyzes and summarizes the two traditional construction methods for deformation joints,and made a practical and feasible construction technical scheme for deformation joint reinforcement and removal of professional anchor.
分 类 号:TU755.2[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49