检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:徐章耀 刘永强 XU Zhangyao;LIU Yongqiang(Henan Baiguishan Reservoir Authority,Pingdingshan 467031,China)
机构地区:[1]河南省白龟山水库管理局,河南平顶山467031
出 处:《水资源开发与管理》2018年第3期73-76,共4页Water Resources Development and Management
摘 要:为了挖掘白龟山水库调蓄能力,协调兴利与防洪之间矛盾,探讨提高汛限水位的可能性,在分析白龟山水库调整汛限水位所涉及影响因素的基础上,系统分析水库防洪调度的主要风险因素,利用蒙特卡罗(MonteCarlo)模拟技术,研究建立白龟山水库防洪调度风险模型,结果表明适当抬高白龟山水库汛限水位增加的系统风险是可以接受的。Main risk factors of reservoir flood control scheduling are systematically analyzed on the basis of analyzing the influence factors about Baiguishan Reservoir in adjustment of flood limit water level in order to excavate regulation and storage ability of Baiguishan Reservoir,coordinate the contradiction between conservancy benefit and flood control,and explore the possibility of improving flood limit water level.Monte Carlo simulation technique is utilized for studying and establishing flood control scheduling risk model in Baiguishan Reservoir.The results show that it is acceptable to suitably raise the system risk of flood limit water level increase in Baiguishan Reservoir.
分 类 号:TV877[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145