检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:胡清顺 王和芬 王飞 HU Qingshun;WANG Hefen;WANG Fei(Yunnan Water Diversion Center,Kunming 650051,China;Yunnan Water Conservancy and Hydropower Survey and Design Institute,Kunming 650021,China;Yunnan Water Conservancy and Hydropower Construction Management and Quality Safety Center, Kunming 650221,China)
机构地区:[1]云南省调水中心,云南昆明650051 [2]云南省水利水电勘测设计研究院,云南昆明650021 [3]云南省水利水电建设管理与质量安全中心,云南昆明650221
出 处:《水利建设与管理》2018年第3期33-36,共4页Water Conservancy Construction and Management
摘 要:以庙林水电站为例,通过编制阻抗式调压室数值基本方程,试算阻抗式调压室在最不利组合工况下的水位波动和底板压差值,将试算结果数值与水力模型试验结果进行分析对比,结果表明对水力边界条件相似的引水式电站,只要选择合适的阻抗系数,数值计算结果是可行的。Miaolin Hydropower Station is adopted as an example,water level fluctuation and bottom board pressure difference values of impedance surge chamber under the most unfavorable combination conditions are calculated through formulating impedance surge chamber numerical fundamental equation.The trial calculation result values and hydraulic model test results are analyzed and compared.The result shows that as long as suitable impedance coefficient be selected in water diversion type power station with similar hydraulic boundary conditions,the results of numerical calculation are feasible.
关 键 词:阻抗式调压室 水位波动 底板压差 数值计算 模型试验
分 类 号:TV135[水利工程—水力学及河流动力学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.174