察汗乌苏水电站压油装置的增容改造与应用  

Compatibilization and Application of Oil Pressure Unit in Khan Wu Su Hydropower Station

在线阅读下载全文

作  者:王海 赵文利 姚邦葛 WANG Hai;ZHAO Wenli;YAO Bangge(Xinjiang state power Kaidu River Hydropower Development Co.,Ltd.,Bayinguoleng 841000)

机构地区:[1]国电新疆开都河流域水电开发有限公司,巴音郭楞841000

出  处:《现代制造技术与装备》2018年第2期160-161,共2页Modern Manufacturing Technology and Equipment

摘  要:介绍了察汗乌苏水电站自2007年投产以来,3台机组压油装置相继出现压油装置压油泵损坏及调速系统油温过高等一系列问题,国电新疆开都河流域水电开发有限公司技术人员在最小改造原有压油装置的基础上对压油装置进行增容圆满解决了存在的问题。The Chahanwusu hydropower station has been put into operation since 2007,3 units of oil pressure device appeared oil pressure pressure oil pump and speed control system of a series of problems in higher temperature,Guodian Xinjiang River Hydropower Development Company Limited and technical personnel based on the minimum transformation of the original oil pressure on the oil pressure device capacity successfully to solve the problems.

关 键 词:水电站 压油装置 增容改造 

分 类 号:TV738[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象